SteelCore Tanks - The #1 Corrugated Bolted Steel Tank in the World

1000's of Installations

Superior Choice with a Lower Cost

Tank Features
Carbon Welded Steel Tanks
Factory Coated Bolted Steel Tanks
Corrugated Galvanized Bolted Steel Tanks
1000's of tank installations in the market
SteelCoreTank Manufacturing Primary Product Line
STRUCTURAL DESIGN
Designed to IBC and ASCE7 Structural codes for water storage
Site Specific Structural Calculations- Wet Stamped
Detailed Submittal Drawings- including As Built Drawings
Seismic Anchoring Designs
High Wind Designs
COATINGS
Exterior Color Available
Uses Field Applied Interior & Exterior Coatings
Uses Thermoset Interior & Exterior Powder Coatings
Uses Zinc Galvanized Steel - G115 & G140
Uses Mastic Sealants to seal panels to achieve water tight structure
Uses 30 mil - 60 mil Flexible Membrane Liners as Water Sealant
Water has direct constant contact with flexible membrane liner
Water has direct constant contact with tank coating
FITTINGS & APPURTENANCES
ASTM Bolts
Flanges - ANSI 150 #
Flange - Wall Penetrations
Flange - Floor Penetrations
Includes OSHA approved ladders, cages, appurtenances
Deck Manways - Lockable
Side Shell Manways - 24" & 36"
Roof Vent - 24" - 42"
Liquid Level Gauge Board &Target
Catwalks & Other Specialty Systems
Suction Flanges with Anti Vortex Plate- NFPA22
Partial & Full Guardrails Available
US GALLON CAPACITIES
Capacities up to 2.9 Million Gallons
DESIGN APPLICATIONS
NFPA 22 equivalent - Fire Protection
Potable Water Storage - NSF61 Certified Coatings/Liners
Waste Water Storage
OTHER OPTIONS
Insulation Systems - Interior
Insulation Systems - Exterior
Low Cost Quick Lead Times Fast Installation Times Long Warranties More Choices
BENEFITS
HOW?
WHO?
LOWER COST: Up to 50% more cost effective than other AWWA steel tank choices.
Low Cost Materials, Simple Installations
Schools, Municipalities, Engineers, Architects, End Users
QUICK LEAD TIMES: Lead times can be as fast as 2-4 weeks for material fabrication.
Specialty Manufacturing facilities allow for fast turn around. Steel is previously Zinc Galvanized prior to manufacturing.
Schools, Municipalities, Engineers, Architects, End Users
FAST INSTALLATION TIMES: Short lead times due to lighter weight materials and ease of installation due to manufacturing designs. Less equipment needed.
Lighter weight materials. Heavy equipment like cranes or booms- not required. Massive flexible membrane liner creates water tight seal. Welded to fit interior of tank prior to arrival onsite.
Schools, Municipalities, Engineers, Architects, End Users
LONG WARRANTIES: Up to 30 Year Warranties are available.
Zinc Galvanized Sheets – high corrosion resistance. Flexible Membrane Liner protects steel from constant water contact.
Schools, Municipalities, Engineers, Architects, End Users
MORE CHOICES: More Sizes, Flexible Membrane Liners, Coatings & Roof Style Options.
You deserve to have more options for steel tanks for potable water.
Schools, Municipalities, Engineers, Architects, End Users